Enhancement of 34.5kV & 13.8kV Bus System at MSS1 (AF-1321020)

Enhancement of 34.5kV & 13.8kV Bus System at MSS1 (AF-1321020) 2020-08-05T08:40:40+03:00

Project Description

Enhancement of 34.5kV & 13.8kV Bus System at MSS1 (AF-1321020)

Start Date:
Jan. 14, 2016
End Date:
Jan. 22, 2016

Location:
Jubail, Kingdom of Saudi Arabia

Your Content Goes Here

Client:

Saudi Basic Industries (SABIC)

HADEED Affiliate

HADEED has decided to enhance the reliability of its Long Product Facility (LPF) Main substation MSS-1, power supply system, by adding one set of three (3) winding transformer thru existing spare 230kV GIS bus feeder which shall operate as redundant supply unit source for 34.5kV and 13.8kV system bus system that shall feed SPLP furnaces electrical load consumers.

Project Goal and Scope:

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01).
  • Review & Evaluate the installation package documents produced by fire protection contractor. Identify the format and contents of Safety and Fire Protection Packages which are to be submitted to the High Commission for Industrial Security (HCIS) as required in SAF-01.
  • Review & Evaluate the As-Built Drawings Package produced by LSTK contractor.
  • Obtaining HCIS approval.