Petrochemical Plants

Petrokemya Butadiene DBN Project 2020-07-08T11:55:04+03:00

Project Description

Petrokemya Butadiene DBN Project

Start Date: Dec. 7th, 2016
End Date: On-going

Client:

PETROKEMYA (PK)

PETROKEMYA (PK) owns the existing Butadiene Extraction Plant in Jubail, Saudi Arabia and planning to increase the current capacity of 123 KTA to a nominal 197 KTA capacity, with 60% increase in Butadiene production.

KBR Technology Business Unit (TBU) have developed the Process Design Package (PDP) for this revamp Project based on the existing plant data and plant simulations provided by SABIC T&I (Licensor).

Project Goal and Scope:

  • Prepare Front End Engineering package FEED which include fire hazard analysis, building code analysis, design basis, Identification of Fire Protection, Fire Detection, Alarm and design parameters, generic material, equipment specifications and all documents & drawings as required by HCIS directives (SAF-01).
  • Review & Evaluate the installation package documents produced by fire protection contractor. Identify the format and contents of Safety and Fire Protection Packages which are to be submitted to the High Commission for Industrial Security (HCIS) as required in SAF-01.